2017

March:
March 10th onwards Daily Gospel Reflections were podcast on Living Flame website, Facebook.

April:
A bollard at the rectory basement area was fixed to prevent the garbage trucks hitting our rectory roof and wall. This work was successfully completed by the Knights of Columbus members. We are grateful to them for this service to the Church.

May:
May 12th onwards we renovated and painted the exterior of the entire Church. This money was donated by an anonymous donor to the Church. The Stain Glass windows were washed and cleaned.

June:
Archbishop Michael Miller CSB confers confirmation on 5 candidates from our parish on June 29th during 4 pm mass. It was a grand celebration.

July:
We installed new sound system in the Church costing nearly 9,000 dollars. The system also was upgraded with new wiring etc.

August:
The external water connection at the rectory basement was repaired. Besides the plumbers fixed the faucet in the basement kitchen. The external supply of water was secured for winter season so that the cold weather may not break pipes.

In the second week onwards, Daily Rosary Recitation in the Church after the morning mass was introduced by Allyson one of the enthusiastic Secular Carmelites.

October:
On 2nd October we inaugurated much awaited new  Grotto of Our Lady of Lourdes. This was donated by an anonymous donor. The new water feature was added to the joy and happiness of the parishioners. We had a grand parish feast celebration in the Millennium hall adjacent to the Millennium tower.

November:
In this month new landscapers take charge of maintaining our gardens around the rectory and the Church.

December:
New lighting at the Grotto of Our Lady is planned. A few new plants are planted in the area of the Grotto.